跳到主內容

合作工時計算機

數學計算機

共同完工時間計算,支援提前開工、進排水管反向求解

答案速覽

Work Together Calculator: Combined work time · head start · fill & drain pipes · back-solve. Work Together Calculator uses standard math formulas to compute accurate results instantly.

Time working together
2 d
33.33% less time than the quickest person alone
Combined rate50%
Quickest alone3 d
Time saved33.33%
In minutes2,880 min

各自完成的工作量占比

工作量占比

A 66.67%67 (66.7%)B 33.33%33 (33.3%)

常見工程問題模型

模型公式範例
Two workerst = a·b ÷ (a+b)3 天 + 6 天 → 2 天
Three workerst = 1 ÷ (1/a+1/b+1/c)2h + 3h + 6h → 1 h
Head startT = m + (1−m/a) ÷ (1/a+1/b)甲 4 天先做 1 天,乙 6 天 → 共 2.8 天
Fill & draint = a·b ÷ (b−a)(需 b>a)进 4h 出 6h → 12 h
Back-solveb = a·t ÷ (a−t)(需 a>t)合作 2 天 + 甲 3 天 → 乙 6 天
Alternating days每个周期完成 1/a+1/b,逐周期累加甲 2 天乙 4 天轮流 → 2.5 天
工程問題把總工作量看作 1:效率 = 1 ÷ 單獨時間,合作時間 = 1 ÷ 效率之和。行测速算技巧:設總量為各時間的最小公倍數(3 天、6 天設總量 6 份,甲每天 2 份、乙 1 份,口算即得合作 2 天)。進出水問題是「負效率」合作:出水不慢於進水時永遠注不滿。合作時間一定短於最快者單獨完成的時間——結果不滿足此規律說明輸入有誤。

計算步驟

  1. 1Rate = 1 / solo time: A 33.33%, B 16.67% (per input unit)
  2. 2Combined rate = 50% per unit
  3. 3Together time = 1 ÷ combined rate = 2 d

這個工具對你有幫助嗎?

怎麼用

  1. Enter values or expressions: type directly into the Work Together Calculator — keyboard friendly.
  2. Instant results: everything computes live as you type, no button needed.
  3. Follow the steps: the result panel shows full working and formula substitution.
  4. Copy or recompute: one-click copy; change any input to recalculate instantly.

核心要點

  • Work Together Calculator is a free online math tool — open and use, no sign-up.
  • All calculations run locally in your browser; your data never leaves the device.
  • Key capability: Combined work time · head start · fill & drain pipes · back-solve.
  • Results come with formulas and reference tables so you can verify every number.

原理與公式

Work Together Calculator formula

Work Together Calculator uses standard math formulas to compute accurate results instantly.

常見問題

How do I use the Work Together Calculator?
Open the page and fill in the input fields — results update automatically. Combined work time · head start · fill & drain pipes · back-solve.
Are the results accurate?
Yes. All calculations use standard mathematical formulas and are verified for accuracy.
Is it free? Do I need to sign up?
Completely free. No registration, login or download required — just open and use.
Does it work on mobile?
Yes. The responsive design works on phones, tablets and desktops.
Is my data saved?
No. All calculations run locally in your browser. Nothing is uploaded or stored.

相關工具

相關指南

來源與更新

Standard mathematical formulas. All logic verified. Last updated: 2025-07

最近更新:

本頁公式與內容經YiJianSuan團隊覆核,僅供學習參考,實際業務請以官方口徑為準。

內容由YiJianSuan編輯團隊維護並定期覆核,更新與審核流程詳見編輯規範.

引用本頁: YiJianSuan. 合作工時計算機[EB/OL]. https://www.yijiansuan.com/zh-TW/c/math/work-together

本工具提供的結果僅供參考,不構成任何專業建議,請以官方核算為準。