Core answer: 1 day = 24 h = 1,440 min = 86,400 s; 1 week = 168 h; 1 year ≈ 365.25 days ≈ 8,766 h ≈ 31.56 million seconds. Payroll math uses 21.75 average working days/month (China standard); a year has 52 full weeks plus 1–2 extra days, which is why weekday calendars drift.
The conversion spine
| Unit | Equals |
|---|---|
| 1 minute | 60 s |
| 1 hour | 60 min = 3,600 s |
| 1 day | 24 h = 86,400 s |
| 1 week | 7 days = 168 h |
| 1 month (avg) | 30.44 days = 730.5 h |
| 1 year | 365.25 days ≈ 8,766 h |
| 1 decade / century | 10 / 100 years |
The year's fine print
- Why 365.25: Earth orbits in 365 d 5 h 48 m 46 s; leap years add Feb 29 every 4 years, skip centuries (1700, 1800, 1900), unless divisible by 400 (2000 was a leap year).
- 52 weeks + 1: 365 = 52×7 + 1, so next year's same date lands one weekday later (two after leap years).
- Months are uneven: 31, 28/29, 31, 30, 31, 30, 31, 31, 30, 31, 30, 31 — knuckle mnemonic still works.
Worked examples
Example 1 — Hourly wage conversion. ¥10,000/month salary: 21.75 days × 8 h = 174 h → ¥57.5/h. Overtime at 1.5× = ¥86/h weekday, 2× = ¥115 rest day, 3× = ¥172.5 holiday.
Example 2 — Project estimate. "3 person-weeks" = 3 × 40 = 120 person-hours; at 6 effective hours/day that's 4 calendar weeks, not 3 — plan with efficiency factors.
Example 3 — Streaming data usage. 2 h/day of 1080p video (~3 GB/h) for a month: 60 h = 180 GB — time-to-data conversions run household budgets.
Example 4 — Machine uptime. 99.9% yearly uptime allows 8.77 h of downtime; 99.99% allows 52.6 min; each "nine" costs real engineering money.
Common mistakes and myths
- 100-minute hours — 1.5 h = 1 h 30 min, not 1 h 50 min; timesheets in decimal hours trip everyone.
- A year = exactly 52 weeks — it's 52.18 weeks; payroll systems using "weekly × 52" underpay vs monthly by a hair.
- Forgetting time zones in durations — a 14:00–16:00 "2-hour" call spanning a DST change may be 1 or 3 real hours.
- Leap second blindness — UTC occasionally gains a second (27 so far); high-precision systems must not assume 86,400 s/day always.
- Treating months as 4 weeks — 4 weeks = 28 days ≠ a month; "biweekly vs semimonthly" payroll differ by 2 checks a year.